Deprecated: Required parameter $limit follows optional parameter $position in /home1/racmyanmar/public_html/application/models/Common_model.php on line 117
ASUS Shang Hai Factory - Rapid Ativex Coporation Co.,Ltd

ASUS Shang Hai Factory

3b527-rac_project_05.jpg
Area : 130,000m2
Project Costs : USD $25,680,000-
Power : 11KV
Facility capacity : 2000KVAX8
Generator : 2000KW X 5
Air-conditioner capacity : Total 800RT X 5  
Project Scope :
  • Electrical
  • Fire
  • Water supply/drainage
  • Air-condition