Yangon FULLYLIGHT HOTEL Powered Air Conditioning ELV Firefighting and Drainage New Construction Project

9297a-flud-a.jpg
Area : 16,000 m2
Project Costs : US $1,980,000
Equipment Capacity : TR1250KVA*1
Project Scope :
  • 11KV/380V
  • Power line system
  • Water supply and drainage system
  • Central ice water air conditioning system
  •  130RT*2
  • Telephone Television CCTV
  • Internet broadcast system